← Construction & Evaluation

Sheet A-104
PPDPDD CE

Enclosureconcept

Window and door performance and frame details

One-line orientation

Window performance has three separate measures: U-factor for heat conduction, SHGC for solar heat gain, and air leakage for drafts. Do not treat them as the same thing.

Key points

  • High-performance window — three factors, three heat paths:
    • U-value / R-value → conduction: how readily heat conducts through the assembly (lower U-value = better insulator).
    • Low-e glazing: generally reduces heat transfer and solar heat gain.
    • Air leakage → infiltration: air moving through the assembly, measured in CFM.
  • Key metrics to know: U-value, Visible Light Transmission (VLT), and SHGC. VLT is the daylight/views metric (visible light only), distinct from SHGC (total solar energy).
  • Frame material: vinyl has the most thermal expansion; detail the frame so movement and thermal bridging do not undermine the assembly.
  • Door frames — anchoring into the wall:
    • To masonry: anchor tabs that sit between the courses.
    • To steel-stud framing: dedicated stud connection.
    • To wood-stud framing: dedicated stud connection.
    • The frame must be positively tied to the surrounding structure for each substrate type.

Confusions / comparison

Window metricWhat it measuresHeat path”Better” direction
U-factor (U-value)Conductive heat transfer through the assemblyConductionLower = better insulation
SHGCSolar heat admitted through the windowSolar gainLower in hot climates; higher can aid passive solar in cold
Air leakageAir infiltration through the unitInfiltration (CFM)Lower CFM = tighter
VLTVisible light transmitted(daylighting)Depends on daylight/glare goals

Hollow-metal door frame — anchoring by substrate:

Wall typeAnchor method
MasonryAnchor tabs that sit between the courses
Steel-studDedicated stud connection
Wood-studDedicated stud connection

→ The four enclosure control layers (this topic): openings are where control layers must stay continuous · Vapor retarders: perm classes and placement (this topic): condensation control at glazing · Glass glazing types (Construction): annealed/tempered/laminated/insulated glazing that fills the frame.

Spotted an issue with this card? Tell us →

Related units